GENERAL SUPPLIER AND CONTRACTOR SERVICES

Blasting & Coating Pipe Piles Under and Above Water Coating

Client              : PT. Arutmin Indonesia

Duration         : 3 Month

Location         : Kota Baru – Kalimantan Selatan

Periode          : Januari 2016 – Ongoing

Pekerjaan Pemasangan MR/S Sektor Kabil

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 3 Month

Location         : Kabil - Batam

Periode          : Desember 2015 – Februari 2016

Pekerjaan Sandblasting & Painting Tangki 918-921 Depot B

Client             : PT. Dover Chemical

Duration        : 3 Month

Location         : Merak Plant - Banten

Periode          : November 2015 – Januari 2016

 

 

Coating Dan Repair Beton Bawah Dermaga (Area CY 1A)

Client             : PT. Perusahaan Perumahan (Persero) Tbk

Duration         : 12 Month

Location         : Terminal Petikemas Kalibaru Utara Tahap I Pelabuhan Tanjung Priok

Periode          : Agustus 2015 – Ongoing

 

Supply of Material and Application for Blasting Painting for Daman ONGC Project

Client             : PT. Gunanusa Utama Fabricator

Duration         : 6 Month

Location         : Cilegon

Periode          : Agustus 2015 – Ongoing

Projec Name : PS-1; PS-2; Waterproofing Roof

Client             : PT. Styrindo Mono Indonesia

Duration         : 2 Month

Location         : Cilegon

Periode          : October 2015 – Ongoing

Application Blasting for Asahimas D Project

Client             : PT. Kashiwabara Engineering Indonesia

Duration         : 5 Month

Location         : Cilegon

Periode          : Agustus 2015 – Ongoing

 

Application Internal Blasting with Garnet for VCM ST-C906 & EDC Tank ST-5902B for Asahimas – Phase VI

Client             : PT. Toyo Kanetsu Indonesia

Duration         : 5 Month

Location        : Cilegon

Periode          : Juni 2015 – October 2015

Field Painting Application for VCM & EDC Tank for Asahimas – Phase VI

Client             : PT. Toyo Kanetsu Indonesia

Duration         : 5 Month

Location         : Cilegon

Periode          : Juni 2015 – October 2015

Painting Furnace Air Ducting Projec

Client             : PT. Berindo Jaya

Duration         : 2 Week

Location         : Bandar Lampung

Periode          : 03 – 17 March 2015

 

 

Internal Tank Coating Tank No. 2F - 5362

Client             : PT. Mitshubishi Chemical Indonesia

Duration         : 4 Months

Location         : Cilegon – Banten

Periode          : December 2014 – March 2015

Maintenance/Repainting Underground Onlline Valve Projec

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 2 Month

Location         : Bekasi – West Java

Periode          : October 2014– December 2014

Field Blasting & Painting for Naptha Storage Tank FB-1801E

Client             : PT. Toyo Kanetsu Indonesia

Duration        : 4 Months

Location        : Cilegon – Banten

Periode          : December 2014 – April 2015

 

 

Civil Work “Gudang Lima B3 – 13 Lokasi”

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 2 Month

Location         : Area SBU I (13 Location)

Periode          : November 2014 – December 2014

Maintenance/Repainting Underground Onlline Valve

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration        : 2 Month

Location        : Bogor – West Java

Periode          : October 2014– December 2014

 

Repainting Pipe Line Distribution PGN SBU I – Tangerang

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 5 Month

Location         : Jakarta

Periode          : Agustus 2014 – December 2014

 

 

Sandblasting, Repainting Dewatering Bin PLTU Cilacap

Client             : PT. Sumber Segara Primadaya

Duration         : 3 Month

Location         : 2 x 300 MW PLTU  - Cilacap, Java

Periode          : October 2014 – December 2014

 

Floor Coating Offtake Red Zone PGN SBU I – Tangerang

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 2 Month

Location         : Tangerang ( 3 Offake Station)

Periode          : Agustus 2014 – October 2014

Repainting Pipe Line Distribution PGN SBU I – Jakarta

Client : PT. Perusahaan Gas Negara (Persero) Tbk

Duration : 4 Month

Location : Jakarta (24 Location)

Periode : Agustus 2014 – November 2014

Floor Coating Offtake Red Zone PGN SBU I – Karawang

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 2 Month

Location         : Jakarta (2 Location)

Periode          : Agustus 2014 – September 2014

 

 

Floor Coating Offtake Red Zone PGN SBU I - Bekasi

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration        : 2 Month

Location        : Bekasi – West Java (3 Location)

Periode          : July 2014 – Agustus 2014

Repainting Pipe Line Distribution PGN SBU I - Bekasi

Client             : PT. Perusahaan Gas Negara (Persero) Tbk

Duration         : 3 Month

Location         : Bekasi – West Java

Periode          : July 2014 – October 2014

 

 

PT. ASANTURI INTERNUSA

 

Taman Warnasari Indah Blok DWA-15 No.4, Cilegon, Banten 42443 Indonesia

Phone   : 62 254 315186   -   Fax : 62 254 311581

Email    : info@asanturi.com   -   Website: www.asanturi.com